Identification of plant characteristics with regard to natural threats, according to the 118/2011. (VII. 11.) Governmental Decree on „nuclear security requirements towards nuclear structures and related activities”. Constructing new power blocks in the Paks Nuclear Power Plant.
|
2015 | MVM ERBE Zrt. | ||
„Activities preparing the improvement of flood bed delineation of the Danube at the Paks Nuclear Power Plant”, Calculation of the frequency distribution of design flood levels and identification of the flood conveyance paths with the help of 2D hydrodynamic models along the Danube reach from 1523 to 1530 rkm.’ | 2014 – 2015 | FTV geotechnical, land surveying and environmental protection Ltd. / MVM Paks Nuclear Power Plant Zrt. | ||
Follow-up testing of built-in SPIREL corrugated steel pipe-structures manufactured by the TUBOSIDER Hungária Plc | 2014 | TUBOSIDER Hungária Ltd. | ||
Coordination of measures required for the implementation of the EU Water Framework Directive in the Ipoly River basin. Implementation of the ’Joint Ipoly Catchment Management’, HUSK/1101/2.1.1/0153 sub-project (development and application of 1D HEC-RAS hydrodynamic and water quality models) | 2014 | National Environmental Institute | ||
Cooperation in the implementation of the „Flood risk mapping and preparation of strategic risk management plan” (KEOP-2.5.0/B/09-12-2013-0001) project | 2014 | KSzI Ltd. | ||
Preparation of flood bed management plans for the Szob-Tass reach and Szentendrei branch of River Danube, Szob-Ipolytarnóc reach of River Ipoly and Apc-Szentlőrinckáta reach of River Zagyva | 2014 | Central Danube-Valley District Water Authority | ||
„Flood risk mapping and preparation of strategic risk management plan” (KEOP-2.5.0/B/09-12-2013-0001) for the Tass-Dunaföldvár reach of River Danube. | 2014 | VIZITERV Environ Kft. Ltd./OVF General Directorate of Water Management (OVF), Hungary | ||
Environmental Impact Assessment related to the Installation of new power blocks in the Paks nuclear power plant – investigation of flood control, flow and sediment transport conditions, assessment of cooling water intake safety, analysis of mixing of waste- and warm waters, river morphological analyses, with the help of hydrodynamic modelling and hydrological statistics | 2012 – 2014 | MVM ERBE Zrt. | ||
Elaboration of an implementation plan for the construction of a sewerage system for the village of Tök | 2014 | COLAS ALTERRA Zrt. | ||
River bed surveying on the 1630-1660 rkm reach of the Danube for supporting the elaboration of Inland Electronic Navigational Charts (IENC) | 2014 | MÉRDAN Bt. | ||
Characterization of surface- and subsurface water systems within the frame of the inspection and analysis programs that form the basis for the licensing and environmental impact assessment of the Paks Nuclear Power Plant: hydrological characterization and modelling of the plant and its neighborhood including the modelling of the state of bed and bank, and modelling of bed changes and thermal loading with regard to the Danube, | 2012-2014 | MVM ERBE Zrt | ||
Developing model-based (rainfall-runoff + 1D hydrodynamic) hydrological forecasting systems for the River Zala. | 2014-2015 | General Directorate of Water Management (OVF), Hungary | ||
Developing model-based hydrological forecasting systems for the Lake Balaton. | 2014 | General Directorate of Water Management (OVF), Hungary | ||
Facility inspections, regular technical inspections (bed changes, sediment transport, static tests, monitoring of stability): * Regular technical inspection of external cooling water system (hydraulic structures) of the Paks Nuclear Power Plant, implementing the age management program (structures of the external cooling cycle) * Geodesic surveying of the Kisköre River Barrage and the inlet structures of Tiszaroff and Nagykunság flood retention reservoirs; analysis of the result within the frame of facility inspections * facility inspection of the Tiszalök River Barrage and the inlet structures of the Cigánd flood retention reservoir |
2013-2014 2013-2014 2013-2014 |
Paks Nuclear Power Plant Zrt. Central Tisza Region District Water Authority KÖTI-VIZIG
North-Hungarian District Water Authority |
||
CarpathCC projekt: “Carpath Climate Change Framework Project, Preparatory action on climate in the Carpathian region – In - depth assessments of vulnerability of environmental resources and ecosystem-based adaptation measures” ENV.D.l/FRA/2011/0006. Coordination of Service Request 6 of the project: Integrated vulnerability assessments in focal areas. |
2010-2014 | European Commission/Regional Environmental Center (REC) | ||
’Inventorying potential renewable energy production possibilities with regard to the use of surface water resources’ * Quantification of hydropower potentials in the basin of the Eger creek * Identification of typical and extreme runoff conditions in the Eger creek basin with the help of hydrodynamic modelling within the frame of the sub-project „Research on the state and use of surface waters” ”, under the TÁMOP-4.2.2.A-11/1/KONV-2012-0016 project called „Hungarian-German cooperation for climate change based complex analysis of potentials of renewable natural resources, with the aim of creating a reference region with sustainable energy management. „ |
2013-2014 | Eszterházy Károly College | ||
Preparation of water damage prevention plans for settlements with open floodplains (Százhalombatta, Vámosmikola, Hont, Drégelypalánk, Ipolyszög, Őrhalom, Hugyag, Szécsény, Ludányhalászi, Nógrádszakáll, Litke, Ipolytarnóc), by taking into consideration the record breaking, 2013 flood of the Danube | 2014 | Central Danube-Valley District Water Authority | ||
Structural inspection of the gantry crane of the Tass sluice, geo-electronic investigation of the neighborhood, preparing expertise reports | 2014 | BAYER CONSTRUCT Ltd. | ||
Revision of design flood levels on the basis of the record breaking, 2013 flood of the Danube. In cooperation with the Department of Water Maanagement, Technical University of Budapest |
2013 | General Directorate of Water Management (OVF), Hungary | ||
Actualization of the chapter „2. Description of the Plant” within the Final Security Report of the Paks Nuclear Power Plant. Revision and actualization of the hydrological parameters of the Danube reach near the Power Plant on the basis of the 2012 monitoring data | 2013 | PÖYRY ERŐTERV Zrt. | ||
Full scale technical inspection of the Tass and Kvassay sluices following the extreme 2013 flood of the Danube river | 2013 | Central Danube-Valley District Water Authority | ||
Preparing local water damage control plans for the municipalities of Kismaros, Verőce, Zebegény, Szob and Szentendre by taking into consideration the 2013 record breaking flood of the Danube river. | 2013 | Central Danube-Valley District Water Authority | ||
GPS based identification of peaking levels of the 2013 Danube flood in the territory of the Central Danube-Valley District Water Authority; location of the flood signs identified by the Authority. | 2013 | Central Danube-Valley District Water Authority | ||
Surveying municipal temporary flood control structures in the territory of the Central Danube-Valley District Water Authority, following the extreme 2013 flood of the Danube river | 2013 | Central Danube-Valley District Water Authority | ||
Surveying the temporary flood control structures constructed during the 2013 Danube flood in the territory of the Central Danube-Valley District Water Authority | 2013 | Central Danube-Valley District Water Authority | ||
Analysis of mixing of treated wastewater for supporting the construction of the Érd wastewater treatment plant (adaptation of 2D hydrodynamic and transport models for Danube reach at Érd) | 2012-2013 | Municipal Association of Érd and its Surroundings for Sewerage and Wastewater Treatment | ||
Preparation of an action plan for the stabilization of bed of the canal that conveys cooling water to the Tisza Power Plant. | 2013 | Tisza Power Plant Ltd. | ||
Facility inspection of the filling and draining structures of the Nagykunság flood retention reservoir | 2012 | Central Tisza Region District Water Authority | ||
Facility inspection of the Kisköre barrage, 2012. | 2012 | Central Tisza Region District Water Authority | ||
Facility inspection of the northern and southern structures of the Tiszaroff flood retention reservoir, 2012 | 2012 | Central Tisza Region District Water Authority | ||
Facility inspection of the structures of cooling system of the Paks Nuclear Power Plant, 2012 | 2012 | MVM Paks Nuclear Power Plant Zrt. | ||
Facility inspection of the Tiszalök barrage | 2012 | North-Hungarian District Water Authority | ||
Facility inspection of the filling and draining structures of the Cigánd flood retention reservoir, 2012 | 2012 | North-Hungarian District Water Authority | ||
Facility inspection of the Tisza Power Plant, 2012 | 2012 | AES Tisza Power Plant Ltd. | ||
Processing the reports on state inspections and aging management of the Paks Nuclear Power Plant into a digital database, 2012 | 2012 | MVM Paks Nuclear Power Plant Zrt. |